2003

2004

2005

2006

2007

2008

2009

2010
          
Prolojik wins Kennedy fitout at 1 Fenchurch Avenue Image
10 December 2007   Prolojik wins Kennedy fitout at 1 Fenchurch Avenue    

Prolojik has secured the lighting controls package at 1 Fenchurch Avenue for the 5 storey fitout of the Fenchurch Avenue Building. The project builds on the shell-and-core phase completed in 2006.
Prolojik to sponsor Channel 4's Grand Designs Image
03 December 2007   Prolojik to sponsor Channel 4's Grand Designs    

Prolojik will be providing the lighting controls for a forthcoming episode of Channel 4's Grand Designs series. Filming has already commenced on the development by Paul Tarling, which is due for airing in Spring of 2008.

The innovative build has been designed by Paxton Locher Architects and incorporates a number of innovative design features and a state-of-the-art control system.
Prolojik wins Blink Point lighting controls package Image
27 November 2007   Prolojik wins Blink Point lighting controls package    

Prolojik has secured the lighting controls package at Blink Point in Southwark, London. Working with Shepard Engineering Services, Prolojik will be supplying a mixture of switched and dimmable lighting controls to this CAT A fitout.
Evolution House Image
06 November 2007   Evolution House    

Prolojik have secured the supply of lighting controls for Edinburgh College of Arts at Evolution House, Edinburgh. Working with Edinburgh College of Art, Prolojik will utilise PL521 1-10V lighting controls and presence detection.
Project IconProject Details
Prolojik completes fitout of Rio Tinto at Aldermanbury Square Image
05 November 2007   Prolojik completes fitout of Rio Tinto at Aldermanbury Square    

Prolojik has completed the fitout of the executive floor at 5 Aldermanbury Square. This fast moving project was undertaken for Trilectric.
Prolojik wins refurbishment of Johnson & Johnson PGRD at High Wycombe Image
29 October 2007   Prolojik wins refurbishment of Johnson & Johnson PGRD at High Wycombe    

Prolojik has secured the fitout of 2 additional blocks as well as the refurbishment of the existing 5 blocks of the Johnson & Johnson High Wycombe facility. Working for Phoenix Electrical under Como, this fast moving project will be completed Q1,08.
Prolojik secures Fortis fit-out at 5 Aldermanbury Square Image
10 September 2007   Prolojik secures Fortis fit-out at 5 Aldermanbury Square    

Prolojik has won the Fortis Bank fit-out at Aldermanbury Square. Working for Gratte Brothers, the project builds on the builds of the shell & core and Cat A completed by Prolojik earlier in 2007.
Prolojik completes fit-out for Canopius at 1986 Building Image
29 August 2007   Prolojik completes fit-out for Canopius at 1986 Building    

Prolojik has provided a complete turnkey package from design through implementation for the lighting control and terminal HVAC control of three galleries of the 1986 Building at 1 Lime Street.

The fit-out integrates into the existing Prolojik infrastructure within the 1986 Building.
Prolojik wins Babcock & Brown fit-out  at Aldermanbury Square Image
17 July 2007   Prolojik wins Babcock & Brown fit-out at Aldermanbury Square    

Prolojik has secured the fit-out for Babcock & Brown at Aldermanbury Square. Working for CEL the project builds on the builds of the shell & core and Cat A completed by Prolojik earlier in 2007.
Times Report on London's latest “Greenscraper” Image
19 June 2007   Times Report on London's latest “Greenscraper”    

The Willis Building, 51 Lime Street

Owner: British Land
Developer: Stanhope and British Land
Size: 29 floors, 520,00 sq ft lettable space
Main tenant: Willis, with 465,000 sq ft

— Beats building regulations requirements for fuel and power conservation by 20 per cent, helped by automatic light sensors and low-energy light bulbs.

— Automatic taps, individual flush sensors, reduced flush, leak detection and rainwater irrigation bring water consumption 30 per cent below average

— Construction waste cut by 30 per cent
Alistair Darling opens GSK Imperial College Imaging Centre Image
13 June 2007   Alistair Darling opens GSK Imperial College Imaging Centre    

Trade and Industry Sectary Alistair Darling today opened the GSK Imperial College Imaging Centre at White City. Prolojik has provided the general office lighting and specialist laboratory lighting utilising, DSi, DALI and emergency monitoring.
Prolojik wins lighting controls package at National Museum of Scotland Image
08 June 2007   Prolojik wins lighting controls package at National Museum of Scotland    

Prolojik has won the lighting control package at the National Museum of Scotland. Working for McArthur M&E, Prolojik will be providing lighting controls to the NMS Granton facility.
Prolojik wins redevelopment of Jones Lang LaSalle at 22-24 Hanover Square Image
18 May 2007   Prolojik wins redevelopment of Jones Lang LaSalle at 22-24 Hanover Square    

Prolojik has won the lighting control package at 22-24 Hanover Square, London. Working for Gratte Brothers, Prolojik will supply and commission the upgrade of the lighting system.
Royal Opening Ceremony - Force Communications Centre Image
11 May 2007   Royal Opening Ceremony - Force Communications Centre    

The new, state-of-the-art Force Communications Centre at Police Headquarters was opened formally today (May 11, 2007) by His Royal Highness, The Duke of Kent KG.
Prolojik wins fit-out phase of Willis Tower Image
09 May 2007   Prolojik wins fit-out phase of Willis Tower    

Prolojik has secured the fit-out work stream of the Willis Tower. The project will follow in from the shell and core phase and will leverage the infrastructure and equipment used in this phase to provide a seamless integration between the shell and core and fit-out phases.
The Crown Estate Fitout  Image
03 May 2007   The Crown Estate Fitout    

Prolojik has secured fit-out phase of The Crown Estates head-quarters at 16 New Burlington Place. Working for Accurro, Prolojik will be reconfiguring the client floors with DALI lighting control and occupancy control. This fit-out reconfiguration follows on from the original new build contract through Skanska in 2005.
Prolojik completes Huntington Court  Image
07 March 2007   Prolojik completes Huntington Court    

Prolojik has completed the refurbishment of the lighting control system at the Huntington CJC. Working with MITIE, Prolojik has supplied occupancy and switching control of the building.
Prolojik completes new HQ for Prospect Image
05 March 2007   Prolojik completes new HQ for Prospect    

Working for Meica, Prolojik has completed the new headquarters building for the trade union Prospect. The project incorporated an innovative installation including Prolojik's PS330 DALI sensors mounted into Trox chilled beams controlled by PL433 DALI hardwired LCMs in the core areas of each floor.
 Prolojik completes CAT A fit-out of Royex House Image
19 January 2007   Prolojik completes CAT A fit-out of Royex House    

Prolojik has completed the shell and core and CAT A fit-out of Royex House, Aldermanbury Square for Gratte Brothers. Prolojik has supplied DALI control of the open plan floors along with switched controls of the core areas.

Admin 
Home    |    Company    |    Solutions    |    Support    |    Partners    |    Careers    |    Contacts
Prolojik Limited © 2008 | Privacy Policy | Terms Of Use